Planning Engineer (Power Plant) - Eco Plant Services (Bangkok Based)
The Siam Cement Public Co.,Ltd. (SCG)- VSPP Power Plant & Renewable filed
- Fuel MSW & Industrial waste Power Plant is special consideration
- EPC Business turn key (Engineering, Procurement an Construction)
- Satisfy Owner Requirement based Design, Regulation, Law,Standard code and advise costumer solution
- Provide design in Safe operation & maintenance with recommended solution to owner
- Fairly know process of related permits EIA,EHIA, COP, Construction permit, Factory License requirement and PEA, ERC
Responsibilities:- Continue plan, schedule, coordinate, control and manage execution of the VSPP Power Plant Project until completion by Microsoft Project
- Continue regular daily updates of the Live Master Schedule e.g.
- Continue weekly updates of the Live Master Schedule as per the weekly update
- Continue monthly updates of the Live Master Schedule as per the monthly update
- Prepare 3 weeks lookahead based on the actual progress and current site conditions
- Facilitate the weekly progress meeting discussing the previous week progress and the 3 week lookahead with all the Supervisors and Management Team
- Coordination with sub-contractors of all involvement to the Project
- Invites / attend meetings with sub-contractors as required
- Preparation of Daily Reports, Weekly Reports and the Monthly Reports
- Monitoring daily manpower and equipment status and the daily activities at the project site. Updating weekly schedule progress percent complete on the prepared measurement excel spread sheet tools.
- Analysing / assessing the cause of delays and provide suggestions to the Project Manager/ Site Manager to discuss with Construction Team of the mitigating action necessary to be undertaken to catch up the delays.
- Prepare the Manpower and Progress S-Curve (plan vs actual).
- Updating progress percent complete on a monthly basis in Excel
- Attending the daily action meeting, weekly progress meeting and the monthly progress meeting with the Client / Owner.
- Bachelor of Engineering in Mechanical Engineering (GPA > 2.70)
- 3-5 years experience in power plant construction
- Excellent skill in Microsoft Project
- Understand basic overall process of Power plant
- Basic knowledge in rotating machine such Boiler feed water Pump, Fans and Valves type, Piping, Pressure part ASME ,ASTM ,ANSI, JIS,DIN,GB,EN
- Commissioning and test of machinaries and piping such pressure test, Cleaning, leak test in Water ,Air, Chemical Etc.
- Basic knowledge of Operation & maintenance in Power plant, Consumption & consumable for running Power plant, Discharge ash treatment, Flue gas emission control, Water regulation
- Dental insurance (สิทธิการเบิกค่าทันตกรรม)
- Medical insurance
- Staff training and development
- ค่าใช้จ่ายในการเดินทาง
- 5-day work week
- ทุนการศึกษา
- Social security
- Accident Insurance
- Performance/results-based bonus
- Annual bonus
SCG, a leading conglomerate in ASEAN and entering its 111th year of stable growth, recognizes the importance of responsible business practices. It is elevating its operations by integrating sustainable development strategies in line with the United Nations’ Sustainable Development Goals (SDGs) through the “ESG 4 Plus” approach, emphasizing Net Zero – Go Green – Reduce Inequality – Enhance Collaboration Plus Trust through Transparency.